{"version":1,"dataset":"moon-changelog","count":19,"generatedAt":"2026-07-12T16:39:23.153Z","docs":"https://spaceodysseyhub.com/moon/methodology","entries":[{"date":"2026-06-12","module":"landers","summary":"June 2026 data refresh: Artemis III redefined everywhere as crewed LEO HLS docking demo (late 2027, crew Bresnik/Parmitano/Rubio/Douglas named 2026-06-09) with first crewed landing moved to Artemis IV (~2028); IM-3 verified still pre-launch (NET H2 2026); Blue Moon MK1 marked delayed indefinitely after New Glenn NG-3 failure + LC-36 static-fire explosion; Chang'e-7 payload count 18→21 (at Wenchang, ~Aug 2026 launch); Artemis II success (Apr 1-10, 2026) reflected in FAQ.","slugs":["starship-hls","im-3-reiner-gamma","blue-moon-pathfinder-mission-1","blue-moon-mk1-viper","change-7"]},{"date":"2026-06-12","module":"surface","summary":"LTV program rescope recorded: March 2026 'Ignition' build contracts to Astrolab FLEX ($219M) and Lunar Outpost Lunar Dawn ($220M); Intuitive Machines Moon RACER not selected (status → cancelled). AxEMU updated — 850+ hrs crewed pressurized testing, CDR nearing completion, 2027 in-space test, first surface use Artemis IV; placeholder OIG citation fixed to IG-26-006.","slugs":["ltv-astrolab-flex","ltv-lunar-outpost-lunar-dawn","ltv-intuitive-machines-moon-racer","axemu-axiom-space"]},{"date":"2026-06-12","module":"comms","summary":"Gateway Lunar Link marked cancelled (program paused 'in its current form' 2026-03-24; ~$20B pivoted toward surface base; ESA disposition decision due June 2026); 'NLT Dec 2027' full-service date removed.","slugs":["gateway-lunar-link"]},{"date":"2026-06-12","module":"economy","summary":"Hygiene pass: non-ISO asOf values normalized to first-of-month/year with notes (economy + resources); LTV $4.6B IDIQ pool annotated with March 2026 downselect; Orion/Gateway/SLS reconciliation line annotated with Gateway pause.","slugs":["artemis-government-property-26b","clps-contract-ceiling-4-2b","ltv-services-overall-pool","fy2025-reconciliation-orion-gateway-sls","pwc-lunar-economy-2050","mckinsey-space-economy-2035"]},{"date":"2026-05-28","module":"ui","summary":"South-pole SVG landing-site map shipped on the hub and at /moon/map."},{"date":"2026-05-28","module":"ui","summary":"Methodology page (/moon/methodology) with live confidence distribution + 7-step citation waterfall + audit-script preview."},{"date":"2026-05-28","module":"api","summary":"CSV + iCal exports for the mission tracker: /api/moon/missions.csv + /api/moon/missions.ics."},{"date":"2026-05-28","module":"ui","summary":"Interactive comparator at /moon/compare — up to 4 landers side-by-side, pure URL state, JS-free."},{"date":"2026-05-28","module":"ui","summary":"Per-entity detail pages: 53 new statically-generated routes across /moon/landers/[slug], /moon/resources/[slug], /moon/contracts/[slug]."},{"date":"2026-05-28","module":"ui","summary":"Risk register dashboard at /moon/risk synthesized from ProgramData.risks + funding.gaoFindings."},{"date":"2026-05-28","module":"api","summary":"/api/moon/* — 7 JSON endpoints (landers, surface, comms, economy, resources, programs, summary)."},{"date":"2026-05-28","module":"ui","summary":"SourceQuote component + 5 seed verbatim quotes on top citations (IM-1, SpaceX HLS, NSN, OIG IG-25-010, helium-3)."},{"date":"2026-05-28","module":"trust","summary":"Trust layer landed: confidence + lastVerified computed via inferConfidence(); audit script surfaces distribution. 70% high / 20% medium / 9% low."},{"date":"2026-05-28","module":"platform","summary":"/moon hub shipped: 11 Server Components, 3 lens routes, JSON-LD, sitemap, llms.txt, nav. 74 entries / 141 source URLs / 36 schema tests passing."},{"date":"2026-05-28","module":"resources","summary":"Seeded 8 lunar resources with credible skeptic notes (water ice, He-3, regolith, KREEP/REE, lunar O₂, iron, lava tubes, peaks of eternal light).","slugs":["water-ice-psr","helium-3","regolith-construction","kreep-rare-earth-elements","lunar-oxygen-isru","iron-ilmenite","lava-tubes-habitat","peaks-of-eternal-light"]},{"date":"2026-05-28","module":"economy","summary":"26 economy metrics (8 budget, 12 contract, 4 funding, 2 TAM)."},{"date":"2026-05-28","module":"comms","summary":"8 lunar comms/PNT systems (Moonlight, LunaNet, Parsec, Nokia LSCS, Queqiao-2, NSN, Gateway Lunar Link, Lunar Pathfinder)."},{"date":"2026-05-28","module":"surface","summary":"13 surface infrastructure contracts: 3 LTV primes, Lunar Cruiser, Foundational Habitat, ILRS, PRIME-1, Helios, 3× FSP Phase 1, 2× xEVAS suits."},{"date":"2026-05-28","module":"landers","summary":"19 lunar landers seeded with primary-source citations across NASA, JAXA, ISRO, CNSA, ESA, SEC EDGAR."}]}