Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | LUPEX (ISRO lander + JAXA rover) Lunar Polar Exploration Mission Trust: Agency-primary Last verified Remove × | ||
|---|---|---|---|
| Operator | CNSA | JAXA + ISRO | Firefly Aerospace |
| Prime contractor | China Academy of Space Technology (CAST) | JAXA + ISRO | Firefly Aerospace |
| Status | In development | In development | Landed |
| Customer | CNSA | JAXAISRO | NASA-CLPS |
| Launch date | 2026-08 (NET) | 2028 (NET) | 2025-01-15 |
| Landing date | — | — | 2025-03-02 |
| Landing site | Shackleton crater illuminated rim, lunar south pole | Lunar south pole (permanently shadowed crater margin) | Mare Crisium near Mons Latreille (lunar near side) |
| Payload | 18 science payloads across orbiter, lander, rover, mini-hopper, and Queqiao-2 (2026-05-28) | ~350 kg rover with drilling to 1.5 m + ISRO lander (2026-05-28) | 10 NASA CLPS payloads (2025-03-02) |
| Contract value | — | — | $101.5M (2025-03-02) |
| Outcome | China's first dedicated lunar south-pole prospecting mission. Mini-flying probe hops into permanently shadowed regions to sample for water-ice volatiles. Italian laser retroreflector aboard the lander. | Joint ISRO-JAXA water-ice prospecting mission, designated Chandrayaan-5 by India. India's cabinet approved Phase A on 2025-03-10. Launches on JAXA's H3. Carries American and European instruments alongside Indian and Japanese ones. | First fully successful commercial soft landing on the Moon (upright, full mission). Operated 346 hours (~14.4 lunar days of daylight + post-sunset science) before battery depletion. Awarded the 2025 Collier Trophy. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.