Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | |||
|---|---|---|---|
| Operator | CNSA | Astrobotic | ispace |
| Prime contractor | China Academy of Space Technology (CAST) | Astrobotic | ispace |
| Status | In development | Lost | Lost |
| Customer | CNSA | NASA-CLPS | private |
| Launch date | 2026-08 (NET) | 2024-01-08 | 2022-12-11 |
| Landing date | — | — | 2023-04-25 |
| Landing site | Shackleton crater illuminated rim, lunar south pole | Sinus Viscositatis (planned; never reached) | Atlas crater, Mare Frigoris (planned; impacted at altitude ~5 km) |
| Payload | 18 science payloads across orbiter, lander, rover, mini-hopper, and Queqiao-2 (2026-05-28) | 20 payloads from 7 nations (2024-01-08) | Rashid rover (10 kg, UAE/MBRSC) + Sora-Q (0.25 kg, JAXA) + commercial (2023-04-25) |
| Contract value | — | $108M (2024-01-08) | — |
| Outcome | China's first dedicated lunar south-pole prospecting mission. Mini-flying probe hops into permanently shadowed regions to sample for water-ice volatiles. Italian laser retroreflector aboard the lander. | Maiden flight of ULA's Vulcan Centaur. Helium pressurant valve failed to reseal post-actuation, over-pressurizing the oxidizer tank and rupturing it. Lander commanded into controlled re-entry; burned up over South Pacific 2024-01-18. | Travelled ~1.4M km — at the time, furthest a privately funded spacecraft had flown. Software flagged the radar altimeter as faulty after the lander crossed a crater rim cliff and ignored its readings. Lander ran out of fuel hovering ~5 km above surface and free-fell. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.