| Attribute | HAKUTO-R Series 2 Resilience (SMBC × HAKUTO-R Venture Moon) Trust: Agency-primary Last verified Remove × | |
|---|---|---|
| Operator | Astrobotic | ispace |
| Prime contractor | Astrobotic | ispace |
| Status | In development | Lost |
| Customer | NASA-CLPS | private |
| Launch date | 2026-07 (NET) | 2025-01-15 |
| Landing date | — | 2025-06-05 |
| Landing site | Lunar south pole region | Mare Frigoris (center; hard landing) |
| Payload | Venturi Astrolab FLIP rover + mass-simulator + secondary payloads (2026-05-28) | Tenacious micro-rover (5 kg, ispace EU) + 5 commercial payloads (2025-06-05) |
| Contract value | $199.5M (2020-06-11) | — |
| Outcome | NASA cancelled VIPER July 2024 citing cost overruns; saved ~$84M vs ~$104M completion cost. Astrobotic retained the lander demonstration task. Mission slipped from late 2025 to NET July 2026. FLIP rover (Venturi Astrolab) selected as replacement manifest. | Laser Range Finder anomaly during descent caused hard landing; data lost ~90 seconds before scheduled touchdown at 19:17 UTC. NASA's LRO imaged impact dark-smudge on 2025-06-11. ispace's 2025-06-24 technical analysis ruled out propulsion/power; isolated cause to LRF. |