Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | |||
|---|---|---|---|
| Operator | Intuitive Machines | CNSA | ispace |
| Prime contractor | Intuitive Machines | China Academy of Space Technology (CAST) | Draper |
| Status | Landed | In development | In development |
| Customer | NASA-CLPS | CNSA | NASA-CLPS |
| Launch date | 2024-02-15 | 2026-08 (NET) | 2027 (NET) |
| Landing date | 2024-02-22 | — | — |
| Landing site | Malapert A crater, ~300 km from lunar south pole | Shackleton crater illuminated rim, lunar south pole | Schrödinger Basin, lunar far side near south pole |
| Payload | ~100 kg payload capacity (1,908 kg launch mass) (2024-02-22) | 18 science payloads across orbiter, lander, rover, mini-hopper, and Queqiao-2 (2026-05-28) | 300 kg surface payload capacity (2026-05-28) |
| Contract value | $118M (2024-02-15) | — | $73M (2022-07-21) |
| Outcome | First US Moon landing since Apollo 17 and first commercial soft landing in history. Lander tipped to ~30° on touchdown after landing-leg failure but transmitted data for ~7 days before sunset. | China's first dedicated lunar south-pole prospecting mission. Mini-flying probe hops into permanently shadowed regions to sample for water-ice volatiles. Italian laser retroreflector aboard the lander. | Pivoted from Series-2 to APEX 1.0 architecture for higher payload capacity and far-side comms via two relay satellites. Far-side polar landing supports NASA's Endurance-A sample-return precursor science. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.