Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | Blue Moon Mark 1 (flight 2) Blue Moon MK1 / VIPER Delivery Trust: Trade-press only Last verified Remove × | ||
|---|---|---|---|
| Operator | Intuitive Machines | JAXA | Blue Origin |
| Prime contractor | Intuitive Machines | Mitsubishi Electric | Blue Origin |
| Status | Landed | Landed | In development |
| Customer | NASA-CLPS | JAXA | NASA-CLPS |
| Launch date | 2024-02-15 | 2023-09-06 | — |
| Landing date | 2024-02-22 | 2024-01-19 | — |
| Landing site | Malapert A crater, ~300 km from lunar south pole | Near Shioli crater, Mare Nectaris (~10 m precision vs 100 m target) | Lunar south pole (VIPER traverse site) |
| Payload | ~100 kg payload capacity (1,908 kg launch mass) (2024-02-22) | LEV-1 (2.1 kg hopper) + LEV-2 'SORA-Q' (0.25 kg sphere) (2024-01-19) | VIPER rover (~430 kg dry) (2025-09-19) |
| Contract value | $118M (2024-02-15) | — | $190M (2025-09-19) |
| Outcome | First US Moon landing since Apollo 17 and first commercial soft landing in history. Lander tipped to ~30° on touchdown after landing-leg failure but transmitted data for ~7 days before sunset. | First Japanese soft landing; made Japan the 5th nation to soft-land on the Moon. One of two main engines failed at ~50 m altitude; lander touched down on its side but still met 100-m precision goal. Survived four lunar-night cycles despite not being designed for it; declared concluded 2024-08-23. | NASA's CLPS task order awarded 2025-09-19 after pulling VIPER from Griffin. Re-uses second MK1 lander production unit; mission cadence depends on Pathfinder Mission 1 outcome. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.