Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | ||
|---|---|---|
| Operator | Astrobotic | Firefly Aerospace |
| Prime contractor | Astrobotic | Firefly Aerospace |
| Status | Lost | Landed |
| Customer | NASA-CLPS | NASA-CLPS |
| Launch date | 2024-01-08 | 2025-01-15 |
| Landing date | — | 2025-03-02 |
| Landing site | Sinus Viscositatis (planned; never reached) | Mare Crisium near Mons Latreille (lunar near side) |
| Payload | 20 payloads from 7 nations (2024-01-08) | 10 NASA CLPS payloads (2025-03-02) |
| Contract value | $108M (2024-01-08) | $101.5M (2025-03-02) |
| Outcome | Maiden flight of ULA's Vulcan Centaur. Helium pressurant valve failed to reseal post-actuation, over-pressurizing the oxidizer tank and rupturing it. Lander commanded into controlled re-entry; burned up over South Pacific 2024-01-18. | First fully successful commercial soft landing on the Moon (upright, full mission). Operated 346 hours (~14.4 lunar days of daylight + post-sunset science) before battery depletion. Awarded the 2025 Collier Trophy. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.