Pick up to 4 vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it. No JavaScript required.
| Attribute | LUPEX (ISRO lander + JAXA rover) Lunar Polar Exploration Mission Trust: Agency-primary Last verified Remove × | ||
|---|---|---|---|
| Operator | Astrobotic | CNSA | JAXA + ISRO |
| Prime contractor | Astrobotic | China Academy of Space Technology (CAST) | JAXA + ISRO |
| Status | Lost | In development | In development |
| Customer | NASA-CLPS | CNSA | JAXAISRO |
| Launch date | 2024-01-08 | 2026-08 (NET) | 2028 (NET) |
| Landing date | — | — | — |
| Landing site | Sinus Viscositatis (planned; never reached) | Shackleton crater illuminated rim, lunar south pole | Lunar south pole (permanently shadowed crater margin) |
| Payload | 20 payloads from 7 nations (2024-01-08) | 18 science payloads across orbiter, lander, rover, mini-hopper, and Queqiao-2 (2026-05-28) | ~350 kg rover with drilling to 1.5 m + ISRO lander (2026-05-28) |
| Contract value | $108M (2024-01-08) | — | — |
| Outcome | Maiden flight of ULA's Vulcan Centaur. Helium pressurant valve failed to reseal post-actuation, over-pressurizing the oxidizer tank and rupturing it. Lander commanded into controlled re-entry; burned up over South Pacific 2024-01-18. | China's first dedicated lunar south-pole prospecting mission. Mini-flying probe hops into permanently shadowed regions to sample for water-ice volatiles. Italian laser retroreflector aboard the lander. | Joint ISRO-JAXA water-ice prospecting mission, designated Chandrayaan-5 by India. India's cabinet approved Phase A on 2025-03-10. Launches on JAXA's H3. Carries American and European instruments alongside Indian and Japanese ones. |
Pure URL state — no JavaScript, no localStorage, no cookies. The comparison renders entirely on the server from the slugs in the query string. Bookmark or share the URL and the comparison reproduces exactly.
Underlying dataset: GET /api/moon/landers. Methodology: /moon/methodology.