Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Khrunichev / Roscosmos | Rocket Lab | Avio / Arianespace |
| Country | 🇷🇺 Russia | 🇺🇸 USA | 🇪🇺 Europe |
| Status | Active | In Development | Active |
| Vehicle class | Heavy | Medium | Small |
| Propellant | RP-1 / LOX (RD-191, all 5 modules) | CH₄ / LOX | Solid (HTPB + ammonium perchlorate all four stages) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 4 |
| First flight | 2014 | 2026 | 2022 |
| Payload to LEO | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO ↑ Best | 13,000 kgas of [1]Expendable; ~8,000 kg reusable with first-stage return | 2,300 kgas of [1]SSO: ~1,700 kg |
| Payload to GTO | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. ↑ Best | — | — |
| Height | 64 mas of [1] ↑ Best | ~40 mas of [1] | 35 mas of [1] |
| Liftoff mass | 773 tas of [1] ↑ Best | ~481 tas of [1] | 210 tas of [1] |
| Success rate | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | — | 75%as of [2]6/8 successes; VV22 (Dec 2022) Zefiro-40 failure destroyed Pléiades Neo 5&6; returned to flight VV25 (Dec 2024). 3 successes in 2025. |
| Total flights | 4as of [2] | — | 8as of [2] ↑ Best |
| Cost / kg LEO | — | — | ~$16,500/kgas of [1]Based on ~$38M list price / 2,300 kg ↓ Cheapest |
| Summary | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Europe's primary small satellite launcher derived from Vega. The P120C first-stage motor is shared with Ariane 6's solid strap-on boosters. Avio took over programme management from Arianespace in Dec 2025. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.