Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Khrunichev / Roscosmos | SpaceX | NASA / Boeing |
| Country | 🇷🇺 Russia | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | In Development | Active |
| Vehicle class | Heavy | Super Heavy | Super Heavy |
| Propellant | RP-1 / LOX (RD-191, all 5 modules) | CH₄ / LOX | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 2 |
| First flight | 2014 | 2023 | 2022 |
| Payload to LEO | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 95,000 kgas of [1] |
| Payload to GTO | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. | ~21,000 kgas of [1]Reusable configuration estimate | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 64 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 98.1 mas of [1] |
| Liftoff mass | 773 tas of [1] | ~5,000 tas of [1] ↑ Best | 2,608 tas of [1] |
| Success rate | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best |
| Total flights | 4as of [2] | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. ↑ Best | 2as of [2] |
| Cost / kg LEO | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost |
| Summary | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.