Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | |
|---|---|---|---|
| Company | Northrop Grumman | Rocket Lab | ISRO |
| Country | 🇺🇸 USA | 🇳🇿 New Zealand / USA | 🇮🇳 India |
| Status | Retired | Active | Active |
| Vehicle class | Medium | Small | Heavy |
| Propellant | RP-1 / LOX (RD-181 first stage) | RP-1 / LOX | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 3 |
| First flight | 2013 – 2023 | 2017 | 2017 |
| Payload to LEO | 8,000 kgas of [1]Antares 230+ configuration; primarily used for ~3,500–3,800 kg Cygnus cargo | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) | 10,000 kgas of [1] ↑ Best |
| Payload to GTO | — | — | 4,000 kgas of [1] ↑ Best |
| Height | 41 mas of [1] | 18 mas of [1] | 43.43 mas of [1] ↑ Best |
| Liftoff mass | 298 tas of [1] | 13 tas of [1] | 643 tas of [1] ↑ Best |
| Success rate | 91.7%as of [2]11/12 successes; Orb-3 (CRS-3) exploded at liftoff Oct 2014 | 95.4%as of [2]83/87 orbital successes; 21/21 success rate in 2025 calendar year per Rocket Lab investor release | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best |
| Total flights | 12as of [2]Final Antares flight was NG-19 (Aug 1, 2023). NG-20+ moved to Falcon 9 due to Antares RD-181 engine supply disruption (Russia sanctions). | 87as of [2] ↑ Best | 10as of [2] |
| Cost / kg LEO | — | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest |
| Summary | Primary launch vehicle for Cygnus ISS cargo missions from 2013–2023. Its Ukrainian-built Zenit-derived first stage and Russian RD-181 engines became untenable after the 2022 invasion of Ukraine. Northrop switched NG-20 onward to Falcon 9 while Antares 330 (with Firefly Miranda engines) is in development. | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.