Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Northrop Grumman | Firefly Aerospace | ISRO |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇮🇳 India |
| Status | Retired | Active | Active |
| Vehicle class | Medium | Small | Medium |
| Propellant | RP-1 / LOX (RD-181 first stage) | RP-1 / LOX | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages |
| Reusable | No | No | No |
| Stages | 2 | 2 | 4 |
| First flight | 2013 – 2023 | 2021 | 1993 |
| Payload to LEO | 8,000 kgas of [1]Antares 230+ configuration; primarily used for ~3,500–3,800 kg Cygnus cargo ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg |
| Payload to GTO | — | — | — |
| Height | 41 mas of [1] | 29 mas of [1] | 44 mas of [1] ↑ Best |
| Liftoff mass | 298 tas of [1] | 54 tas of [1] | 320 tas of [1]PSLV-XL configuration ↑ Best |
| Success rate | 91.7%as of [2]11/12 successes; Orb-3 (CRS-3) exploded at liftoff Oct 2014 | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). ↑ Best |
| Total flights | 12as of [2]Final Antares flight was NG-19 (Aug 1, 2023). NG-20+ moved to Falcon 9 due to Antares RD-181 engine supply disruption (Russia sanctions). | 7as of [2] | 64as of [2] ↑ Best |
| Cost / kg LEO | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest |
| Summary | Primary launch vehicle for Cygnus ISS cargo missions from 2013–2023. Its Ukrainian-built Zenit-derived first stage and Russian RD-181 engines became untenable after the 2022 invasion of Ukraine. Northrop switched NG-20 onward to Falcon 9 while Antares 330 (with Firefly Miranda engines) is in development. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.