Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Arianespace / ArianeGroup | Khrunichev / Roscosmos | JAXA / IHI Aerospace |
| Country | 🇪🇺 Europe | 🇷🇺 Russia | 🇯🇵 Japan |
| Status | Retired | Active | Retired |
| Vehicle class | Heavy | Heavy | Small |
| Propellant | LH₂ / LOX (Vulcain 2) + solid HTPB boosters | RP-1 / LOX (RD-191, all 5 modules) | Solid (HTPB — all stages) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 3 |
| First flight | 1996 – 2023 | 2014 | 2013 – 2022 |
| Payload to LEO | 21,000 kgas of [1]Ariane 5 ECA configuration | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO ↑ Best | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. |
| Payload to GTO | 10,865 kgas of [1]ECA configuration. Ariane 5 ES (ATV) variant: 21,000 kg LEO ↑ Best | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. | — |
| Height | 54 mas of [1] | 64 mas of [1] ↑ Best | 26 mas of [1] |
| Liftoff mass | 777 tas of [1] ↑ Best | 773 tas of [1] | 96 tas of [1] |
| Success rate | 97.5%as of [2]113/117 successes. Failures: V501 (Jun 1996, first flight), V63 (Dec 2002, off-course but payload recovered). 2 partial successes. | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. |
| Total flights | 117as of [2]VA261 (Jul 5, 2023) was the final Ariane 5 flight. Launched the James Webb Space Telescope (Dec 2021). ↑ Best | 4as of [2] | 6as of [2] |
| Cost / kg LEO | — | — | — |
| Summary | Europe's dominant heavy-lift rocket for 27 years. Its most famous payload: the James Webb Space Telescope (Dec 25, 2021). Retired Jul 5, 2023 to make way for Ariane 6. Responsible for launching over 250 commercial and scientific payloads including XMM-Newton, Rosetta, and BepiColombo. | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.