Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Arianespace / ArianeGroup | Khrunichev / Roscosmos | ISRO |
| Country | 🇪🇺 Europe | 🇷🇺 Russia | 🇮🇳 India |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Heavy | Medium |
| Propellant | LH₂ / LOX (Vulcain 2.1 + Vinci) | RP-1 / LOX (RD-191, all 5 modules) | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages |
| Reusable | No | No | No |
| Stages | 2 | 2 | 4 |
| First flight | 2024 | 2014 | 1993 |
| Payload to LEO | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO ↑ Best | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg |
| Payload to GTO | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. ↑ Best | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. | — |
| Height | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best | 64 mas of [1] | 44 mas of [1] |
| Liftoff mass | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best | 773 tas of [1] | 320 tas of [1]PSLV-XL configuration |
| Success rate | 100%as of [2]7/7 missions through VA268 Amazon Leo (Apr 30, 2026); Ariane 64 debut Feb 12, 2026 ↑ Best | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). |
| Total flights | 7as of [2] | 4as of [2] | 64as of [2] ↑ Best |
| Cost / kg LEO | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest |
| Summary | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.