Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Arianespace / ArianeGroup | CASC / CALT | Firefly Aerospace |
| Country | 🇪🇺 Europe | 🇨🇳 China | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Heavy | Small |
| Propellant | LH₂ / LOX (Vulcain 2.1 + Vinci) | UDMH/N₂O₄ (stages 1–2) + LH₂/LOX (stage 3 YF-75) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 2 | 3 | 2 |
| First flight | 2024 | 1996 | 2021 |
| Payload to LEO | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity ↑ Best | 11,200 kgas of [1] | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. ↑ Best | 5,500 kgas of [1]With 4 strap-on liquid boosters (CZ-3B/E enhanced variant) | — |
| Height | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best | 54.84 mas of [1] | 29 mas of [1] |
| Liftoff mass | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best | 426 tas of [1]Enhanced variant with 4 liquid strap-on boosters | 54 tas of [1] |
| Success rate | 100%as of [2]7/7 missions through VA268 Amazon Leo (Apr 30, 2026); Ariane 64 debut Feb 12, 2026 ↑ Best | ~95%as of [2]~6 failures/partial failures out of ~105+ flights; gradually being superseded by Long March 5 for GTO | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 7as of [2] | ~105as of [2] ↑ Best | 7as of [2] |
| Cost / kg LEO | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices ↓ Cheapest | — | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO |
| Summary | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. | China's primary geostationary transfer vehicle for over 25 years. Launched communications, meteorology, and navigation satellites including Beidou-3 (GEO/IGSO nodes). Being phased out in favour of Long March 5 for heavier GTO payloads as newer domestic communications satellites grow in mass. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.