Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Arianespace / ArianeGroup | Isar Aerospace | SpaceX |
| Country | 🇪🇺 Europe | 🇩🇪 Germany | 🇺🇸 USA |
| Status | Active | In Development | In Development |
| Vehicle class | Heavy | Small | Super Heavy |
| Propellant | LH₂ / LOX (Vulcain 2.1 + Vinci) | LOX / kerosene (~80% manufactured in-house) | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2024 | 2025 | 2023 |
| Payload to LEO | 21,650 kgas of [1]Ariane 62 (2 boosters) / Ariane 64 (4 boosters); 64 offers higher GTO capacity | 1,000 kgas of [1] | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | 11,500 kgas of [1]Ariane 64 configuration. Ariane 62 delivers ~4,500 kg to GTO. | — | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best |
| Height | 56–63 mas of [1]56 m (Ariane 62) / 63 m (Ariane 64 with 4 solid boosters) ↑ Best | — | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy |
| Liftoff mass | 530–860 tas of [1]530 t (A62) / 860 t (A64) ↑ Best | — | ~5,000 tas of [1] |
| Success rate | 100%as of [2]8/8 missions through VA269 Amazon Leo (Jun 17, 2026, 36 sats on upgraded P160C boosters); Ariane 64 debut Feb 12, 2026 ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. |
| Total flights | 8as of [2] | 1as of [1] | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. ↑ Best |
| Cost / kg LEO | ~$7,500/kgas of [1]Estimate based on ~$115M A62 / ~$165M A64 list prices | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | Europe's flagship launcher replacing Ariane 5. The Vinci re-ignitable upper stage enables multi-orbit missions and controlled deorbit. Primary customers: Amazon Kuiper, European government payloads, and ESA science missions. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.