Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | Long March 8 (incl. 8A) 🇨🇳 China Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | |
|---|---|---|---|
| Company | ULA | ISRO | China Academy of Launch Vehicle Technology (CALT) / CASC |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Medium | Heavy | Medium |
| Propellant | RP-1 / LOX (RD-180); LH₂ / LOX (Centaur III) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX (stage 1); LH2/LOX (stage 2) |
| Reusable | No | No | No |
| Stages | 2 | 3 | 2 |
| First flight | 2002 | 2017 | 2020 |
| Payload to LEO | 18,850 kgas of [1]401 configuration. Maximum 401/551 stretch to 20,520 kg. 551 max 29,420 kg (5-solid boosters). ↑ Best | 10,000 kgas of [1] | 8,100 kgas of [1]5,000 kg to 700 km SSO (base); the enlarged-second-stage 8A variant (first flew 2025-02-11) lifts 7,000 kg to the same SSO reference orbit. |
| Payload to GTO | 8,900 kgas of [1]551 configuration (maximum performance) ↑ Best | 4,000 kgas of [1] | — |
| Height | 58.3 mas of [1]401 configuration ↑ Best | 43.43 mas of [1] | 50.3 mas of [1] |
| Liftoff mass | 334 tas of [1]401 configuration without strap-ons | 643 tas of [1] | 356 t (base); 371 t (8A)as of [1] ↑ Best |
| Success rate | 99.1%as of [2]108 full successes + 1 partial failure (NROL-30, Jun 2007 — payload still reached usable orbit) across 109 launches | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. | 100% (16/16 combined base + 8A)as of [1] ↑ Best |
| Total flights | 109as of [2]No longer sold but still flying its backlog: ~8 launches remained as of Apr 2026 (6 Starliner + 2 Amazon Leo); most recent flight Amazon Leo LA-07 (May 29, 2026), ~7 remain | 10as of [2] | 16 (base + 8A combined)as of [1] ↑ Best |
| Cost / kg LEO | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | ULA's workhorse since 2002 and the longest-serving active US rocket. Launched Mars Science Laboratory (Curiosity), OSIRIS-REx, Solar Orbiter, Lucy, New Horizons, and the Boeing Starliner. Production ended in 2024 and ULA no longer sells the vehicle, but it continues flying a sold-out backlog of Starliner and Amazon Leo missions into the late 2020s. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | A two-stage medium-lift launcher originally designed with a reusable combined-booster-recovery concept in mind, though currently operational vehicles fly expendable. Exclusively from Wenchang. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.