Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ULA | NASA / Boeing | ISRO |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇮🇳 India |
| Status | Retired | Active | Active |
| Vehicle class | Medium | Super Heavy | Heavy |
| Propellant | RP-1 / LOX (RD-180); LH₂ / LOX (Centaur III) | LH₂ / LOX (RS-25); solid HTPB (SRBs) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 3 |
| First flight | 2002 – 2024 | 2022 | 2017 |
| Payload to LEO | 18,850 kgas of [1]401 configuration. Maximum 401/551 stretch to 20,520 kg. 551 max 29,420 kg (5-solid boosters). | 95,000 kgas of [1] ↑ Best | 10,000 kgas of [1] |
| Payload to GTO | 8,900 kgas of [1]551 configuration (maximum performance) | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | 4,000 kgas of [1] |
| Height | 58.3 mas of [1]401 configuration | 98.1 mas of [1] ↑ Best | 43.43 mas of [1] |
| Liftoff mass | 334 tas of [1]401 configuration without strap-ons | 2,608 tas of [1] ↑ Best | 643 tas of [1] |
| Success rate | 100%as of [2]99/99 mission successes from Aug 2002 through Apr 2024 (final Kuiper flight). Only launch vehicle with 100% success across 99 missions. ↑ Best | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best |
| Total flights | 99as of [2]Retired after KA-01 (Amazon Kuiper satellite testbed, Apr 9, 2024) ↑ Best | 2as of [2] | 10as of [2] |
| Cost / kg LEO | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest |
| Summary | ULA's workhorse from 2002–2024. Launched Mars Science Laboratory (Curiosity), OSIRIS-REx, Solar Orbiter, Lucy, New Horizons, and the Boeing Starliner. Its Russian RD-180 first-stage engine became a political liability after 2022; last flight was the Amazon Kuiper testbed on Apr 9, 2024. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.