Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-28Remove × | ||
|---|---|---|---|
| Company | Galactic Energy | ULA | Rocket Lab |
| Country | 🇨🇳 China | 🇺🇸 USA | 🇳🇿 New Zealand / USA |
| Status | Active | Active | Active |
| Vehicle class | Small | Heavy | Small |
| Propellant | Solid (stages 1–3) + hydrazine liquid upper stage | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 4 | 2 | 2 |
| First flight | 2020 | 2024 | 2017 |
| Payload to LEO | 400 kgas of [1]300 kg to SSO. | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) |
| Payload to GTO | — | 14,400 kgas of [1] ↑ Best | — |
| Height | 20 mas of [1] | 61.6 mas of [1] ↑ Best | 18 mas of [1] |
| Liftoff mass | 33 tas of [1] | 591 tas of [1]VC2S configuration ↑ Best | 13 tas of [1] |
| Success rate | 91.3% (21/23)as of [1] | 100%as of [2]4/4 payloads delivered: Cert-1 (Jan 2024), Cert-2 (Oct 2024, SRB nozzle anomaly), USSF-106 (Aug 13, 2025 — flight 3, first NSSL mission), USSF-87 (Feb 12, 2026 — flight 4, second SRB nozzle anomaly; Space Force paused Vulcan launches, RTF ~late 2026) ↑ Best | 95.6%as of [3]87 successes / 91 Electron-family flights. Orbital Electron alone: 78/82 (95.1%). HASTE: 9/9. On a 50-flight success streak since December 2023; 21/21 in the 2025 calendar year. |
| Total flights | 23as of [1] | 4as of [2] | 91as of [3]91 Electron-family flights: 82 orbital plus 9 suborbital HASTE. Reconciled against three 10-K cumulative checkpoints (38/54/75 successes through 2023/2024/2025). Rocket Lab counts HASTE inside its own 'Electron launched N times' figure. ↑ Best |
| Cost / kg LEO | ~$4.5M per launchas of [1]Total launch price, not a per-kg figure. ↓ Cheapest | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload |
| Summary | Galactic Energy's workhorse small-lift solid rocket — one of the most-flown Chinese commercial launchers — with a sea-launch variant (Ceres-1S, debuted Sep 2023) and a larger Ceres-2 in development. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. NSSL-certified March 2025; first NSSL mission USSF-106 flew Aug 13, 2025. Paused by the Space Force after the USSF-87 SRB nozzle anomaly (Feb 12, 2026), with return to flight expected ~late 2026. | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.