Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Rocket Lab | JAXA / Mitsubishi Heavy Industries | Blue Origin |
| Country | 🇳🇿 New Zealand / USA | 🇯🇵 Japan | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Small | Heavy | Heavy |
| Propellant | RP-1 / LOX | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) |
| Reusable | Yes | No | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2017 | 2024 | 2025 |
| Payload to LEO | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best |
| Payload to GTO | — | 6,500 kgas of [1] | 13,000 kgas of [1]Reusable first stage configuration ↑ Best |
| Height | 18 mas of [1] | 57 mas of [1] | 98 mas of [1] ↑ Best |
| Liftoff mass | 13 tas of [1] | 574 tas of [1]H3-24S configuration | 1,016 tas of [1] ↑ Best |
| Success rate | 95.4%as of [2]83/87 orbital successes; 21/21 success rate in 2025 calendar year per Rocket Lab investor release ↑ Best | 75%as of [2]~6/8 successes. TF1 (Feb 2023) first flight failure (LE-9 ignition issue, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded |
| Total flights | 87as of [2] ↑ Best | 8as of [2] | 3as of [2] |
| Cost / kg LEO | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest |
| Summary | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses three LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First successful flight was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness. | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.