Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Rocket Lab | NASA / Boeing | CASC / SAST |
| Country | 🇳🇿 New Zealand / USA | 🇺🇸 USA | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Small | Super Heavy | Medium |
| Propellant | RP-1 / LOX | LH₂ / LOX (RS-25); solid HTPB (SRBs) | UDMH / N₂O₄ (hypergolic all stages) |
| Reusable | Yes | No | No |
| Stages | 2 | 2 | 2 |
| First flight | 2017 | 2022 | 1992 |
| Payload to LEO | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) | 95,000 kgas of [1] ↑ Best | 3,500 kgas of [1]SSO capacity ~1,300 kg; standard LEO 3,500 kg |
| Payload to GTO | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — |
| Height | 18 mas of [1] | 98.1 mas of [1] ↑ Best | 41.06 mas of [1] |
| Liftoff mass | 13 tas of [1] | 2,608 tas of [1] ↑ Best | 232 tas of [1] |
| Success rate | 95.4%as of [2]83/87 orbital successes; 21/21 success rate in 2025 calendar year per Rocket Lab investor release | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 98.7%as of [2]~77/78 successes; one known failure (CZ-2D Y7, Mar 1995 upper-stage anomaly) |
| Total flights | 87as of [2] ↑ Best | 2as of [2] | ~78as of [2] |
| Cost / kg LEO | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload ↓ Cheapest | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | — |
| Summary | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | China's most-used sun-synchronous and polar orbit workhorse for small-to-medium military and commercial Earth observation satellites. Launched from Jiuquan and Taiyuan. Uses storable hypergolic propellants for high launch-readiness but produces toxic exhaust. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.