Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Rocket Lab | SpaceX | Firefly Aerospace |
| Country | 🇳🇿 New Zealand / USA | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | In Development | Active |
| Vehicle class | Small | Super Heavy | Small |
| Propellant | RP-1 / LOX | CH₄ / LOX | RP-1 / LOX |
| Reusable | Yes | Yes | No |
| Stages | 2 | 2 | 2 |
| First flight | 2017 | 2023 | 2021 |
| Payload to LEO | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | — | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | — |
| Height | 18 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 29 mas of [1] |
| Liftoff mass | 13 tas of [1] | ~5,000 tas of [1] ↑ Best | 54 tas of [1] |
| Success rate | 95.4%as of [2]83/87 orbital successes; 21/21 success rate in 2025 calendar year per Rocket Lab investor release ↑ Best | ~55%as of [2]IFT-1 through IFT-11; ~6 complete mission successes, remainder partial or vehicle lost. No orbital payload deployment yet. | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 87as of [2] ↑ Best | 11as of [2]IFT-1 (Apr 2023) through IFT-11 (May 2026 target). IFT-10 (Aug 2025) achieved full mission: booster caught + Ship splash-down. | 7as of [2] |
| Cost / kg LEO | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO |
| Summary | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship introduced Aug 2025. Mechazilla caught the booster on IFT-5 (Oct 2024) and IFT-10 (Aug 2025). Primary vehicle for Artemis HLS lunar landing (Artemis III planned 2026). | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.