Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | JAXA / IHI Aerospace | ISRO | Isar Aerospace |
| Country | 🇯🇵 Japan | 🇮🇳 India | 🇩🇪 Germany |
| Status | Retired | Active | In Development |
| Vehicle class | Small | Heavy | Small |
| Propellant | Solid (HTPB — all stages) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LOX / kerosene (~80% manufactured in-house) |
| Reusable | No | No | No |
| Stages | 3 | 3 | 2 |
| First flight | 2013 – 2022 | 2017 | 2025 |
| Payload to LEO | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. | 10,000 kgas of [1] ↑ Best | 1,000 kgas of [1] |
| Payload to GTO | — | 4,000 kgas of [1] ↑ Best | — |
| Height | 26 mas of [1] | 43.43 mas of [1] ↑ Best | — |
| Liftoff mass | 96 tas of [1] | 643 tas of [1] ↑ Best | — |
| Success rate | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. |
| Total flights | 6as of [2] | 10as of [2] ↑ Best | 1as of [1] |
| Cost / kg LEO | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.