Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Electron 🇳🇿 New Zealand / USA Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-28Remove × | ||
|---|---|---|---|
| Company | JAXA / IHI Aerospace | Blue Origin | Rocket Lab |
| Country | 🇯🇵 Japan | 🇺🇸 USA | 🇳🇿 New Zealand / USA |
| Status | Retired | Active | Active |
| Vehicle class | Small | Heavy | Small |
| Propellant | Solid (HTPB — all stages) | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) | RP-1 / LOX |
| Reusable | No | Yes | Yes |
| Stages | 3 | 2 | 2 |
| First flight | 2013 – 2022 | 2025 | 2017 |
| Payload to LEO | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best | 300 kgas of [1]~200 kg reusable mode (lower due to propellant reserved for re-entry burn) |
| Payload to GTO | — | 13,000 kgas of [1]Reusable first stage configuration ↑ Best | — |
| Height | 26 mas of [1] | 98 mas of [1] ↑ Best | 18 mas of [1] |
| Liftoff mass | 96 tas of [1] | 1,016 tas of [1] ↑ Best | 13 tas of [1] |
| Success rate | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded | 95.6%as of [3]87 successes / 91 Electron-family flights. Orbital Electron alone: 78/82 (95.1%). HASTE: 9/9. On a 50-flight success streak since December 2023; 21/21 in the 2025 calendar year. ↑ Best |
| Total flights | 6as of [2] | 3as of [2] | 91as of [3]91 Electron-family flights: 82 orbital plus 9 suborbital HASTE. Reconciled against three 10-K cumulative checkpoints (38/54/75 successes through 2023/2024/2025). Rocket Lab counts HASTE inside its own 'Electron launched N times' figure. ↑ Best |
| Cost / kg LEO | — | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest | ~$25,000/kgas of [1]Based on ~$7.5M list price / 300 kg payload |
| Summary | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. On May 28, 2026 a vehicle was destroyed in a prelaunch static-fire explosion at LC-36. Damage proved less severe than first feared — Blue Origin (CEO Dave Limp) reported the propellant tanks and water tower were undamaged, the launch tower repairable rather than replaced, and stored first/second stages intact, with LC-36 debris cleared within ~9 days. The company has started reconstruction and now targets a return to flight before the end of 2026 (a timeline some observers call aggressive). | The world's most commercially active small launch vehicle, designed and built in-house at Rocket Lab. Rutherford engines are the first flight-proven engines made with additive manufacturing (metal 3D printing). Booster recovery via parachute and helicopter catch (later transitioned to ocean recovery). |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.