Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | JAXA / IHI Aerospace | Relativity Space | Space One |
| Country | 🇯🇵 Japan | 🇺🇸 USA | 🇯🇵 Japan |
| Status | Retired | In Development | In Development |
| Vehicle class | Small | Heavy | Small |
| Propellant | Solid (HTPB — all stages) | LOX / methane | Solid |
| Reusable | No | Yes | No |
| Stages | 3 | 2 | 4 |
| First flight | 2013 – 2022 | 2026 | 2024 |
| Payload to LEO | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. | 33,500 kg expendable / 23,500 kg with a reusable first stageas of [1]First flight targeted 2026 (stated plan, not yet confirmed flown as of this research). ↑ Best | — |
| Payload to GTO | — | — | — |
| Height | 26 mas of [1] | 87 mas of [1] ↑ Best | — |
| Liftoff mass | 96 tas of [1] ↑ Best | — | — |
| Success rate | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. ↑ Best | — | 0/3 — three consecutive failuresas of [1]2024-03-13: disintegrated shortly after liftoff. 2024-12-18: began tumbling during 1st-stage burn, flight terminated. 2026-03-04: flight termination activated ~70 seconds after liftoff. All three launches flew from Spaceport Kii, Wakayama — Japan's first private-sector spaceport. Program grounded as of this research; precise payload/height/mass specs not confirmed from a primary source. |
| Total flights | 6as of [2] ↑ Best | — | 3as of [1] |
| Cost / kg LEO | — | ~$55M per launch (estimate)as of [1]Total launch price estimate, not a per-kg figure. ↓ Cheapest | — |
| Summary | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. | Relativity Space's Falcon-9-class successor to Terran 1, partially 3D-printed, with 13 Aeon R methalox engines on a reusable first stage; second stage and fairing expendable. | A Japanese commercial solid-fuel small launcher that has failed on all three flight attempts through March 2026, putting its commercial viability in serious question. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.