Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | JAXA / IHI Aerospace | ULA | LandSpace |
| Country | 🇯🇵 Japan | 🇺🇸 USA | 🇨🇳 China |
| Status | Retired | Active | Active |
| Vehicle class | Small | Heavy | Medium |
| Propellant | Solid (HTPB — all stages) | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | CH₄ / LOX (Tianque-12 + Tianque-15 upper stage) |
| Reusable | No | No | No |
| Stages | 3 | 2 | 2 |
| First flight | 2013 – 2022 | 2024 | 2022 |
| Payload to LEO | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 6,000 kgas of [1]SSO capacity ~4,000 kg |
| Payload to GTO | — | 14,400 kgas of [1] ↑ Best | — |
| Height | 26 mas of [1] | 61.6 mas of [1] ↑ Best | 49.5 mas of [1] |
| Liftoff mass | 96 tas of [1] | 591 tas of [1]VC2S configuration ↑ Best | 219 tas of [1] |
| Success rate | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. | 100%as of [2]4/4 mission successes: VC2 Cert-1 (Jan 2024), VC2 Cert-2 (Oct 2024), VC4 USSF-87 (Feb 2026), VC2 USSF-106 (Mar 2026) ↑ Best | 75%as of [2]3/4 full successes; ZQ-2 Y1 (Dec 2022) reached orbit on stage 1 but 2nd stage failed; ZQ-2 Y2 (Jul 2023) SUCCESS — world's first methane-fueled rocket to reach orbit |
| Total flights | 6as of [2] ↑ Best | 4as of [2] | 4as of [2] |
| Cost / kg LEO | — | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. ↓ Cheapest | — |
| Summary | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. Primary customer is USSF under NSSL Phase 2. | The world's first methane-fueled rocket to achieve orbit (July 12, 2023), beating SpaceX Starship to that milestone. A commercial Chinese rocket built by LandSpace with vertically-integrated methane propulsion — the same propellant strategy as Starship, Neutron, and Terran R. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.