Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Gilmour Space Technologies | ExPace (CASIC subsidiary) | ISRO / Hindustan Aeronautics Limited |
| Country | 🇦🇺 Australia | 🇨🇳 China | 🇮🇳 India |
| Status | In Development | Active | Active |
| Vehicle class | Small | Small | Small |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | Solid (3 stages) + liquid upper stage | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) |
| Reusable | No | No | No |
| Stages | 3 | 4 | 4 |
| First flight | 2025 | 2020 | 2022 |
| Payload to LEO | 300 kgas of [1] | 1,500 kgas of [1] ↑ Best | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. |
| Payload to GTO | — | — | — |
| Height | 25 mas of [1] | — | 34 mas of [1] ↑ Best |
| Liftoff mass | — | 78 tas of [1]Transporter-erector-launcher (TEL) capable. | 120 tas of [1] ↑ Best |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 80% (4/5)as of [1]Debut flight (2020-07-10) failed; returned to flight 2022-12-07 successfully. ↑ Best | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. |
| Total flights | 1as of [1] | 5as of [1] ↑ Best | 3as of [1] |
| Cost / kg LEO | — | — | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. ↓ Cheapest |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | The larger sibling of Kuaizhou-1A, roughly 3.75x the payload class, road-mobile and solid-fueled, recovering commercial cadence after a 2020 debut failure. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.