Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Gilmour Space Technologies | CASC / CALT | ISRO |
| Country | 🇦🇺 Australia | 🇨🇳 China | 🇮🇳 India |
| Status | In Development | Active | Active |
| Vehicle class | Small | Medium | Medium |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | RP-1 / LOX (YF-100 + YF-115) | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages |
| Reusable | No | No | No |
| Stages | 3 | 2 | 4 |
| First flight | 2025 | 2016 | 1993 |
| Payload to LEO | 300 kgas of [1] | 13,500 kgas of [1]SSO capacity ~5,500 kg ↑ Best | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg |
| Payload to GTO | — | — | — |
| Height | 25 mas of [1] | 53.1 mas of [1] ↑ Best | 44 mas of [1] |
| Liftoff mass | — | 597 tas of [1] ↑ Best | 320 tas of [1]PSLV-XL configuration |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 100%as of [2]12/12 missions, all Tianzhou ISS resupply or CZ-7 tech demo flights ↑ Best | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). |
| Total flights | 1as of [1] | 12as of [2]Most recently Tianzhou-10 cargo to Tiangong (May 11, 2026) | 64as of [2] ↑ Best |
| Cost / kg LEO | — | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | China's workhorse medium-lift rocket, used exclusively for Tianzhou automated cargo missions to the Tiangong space station. Designed to replace the Long March 2F for high-cadence LEO/cargo missions. Uses the same YF-100 engines as Long March 5's boosters. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. The vehicle is on a return-to-flight campaign (not retired): PSLV-C63 (TDS-01 technology demonstrator), with strengthened third-stage/PS3 checks following the expert-committee (FAC) review, is targeted for late June / early July 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.