Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Gilmour Space Technologies | Blue Origin | CASC / CALT |
| Country | 🇦🇺 Australia | 🇺🇸 USA | 🇨🇳 China |
| Status | In Development | Active | Active |
| Vehicle class | Small | Heavy | Heavy |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) | LH₂ / LOX (YF-77 core) + RP-1/LOX (YF-100 boosters) |
| Reusable | No | Yes | No |
| Stages | 3 | 2 | 2 |
| First flight | 2025 | 2025 | 2016 |
| Payload to LEO | 300 kgas of [1] | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best | 25,000 kgas of [1]CZ-5B variant (no upper stage) delivers 25,000 kg LEO for Tiangong station modules |
| Payload to GTO | — | 13,000 kgas of [1]Reusable first stage configuration | 14,000 kgas of [1]CZ-5 variant (with YF-75D upper stage) ↑ Best |
| Height | 25 mas of [1] | 98 mas of [1] ↑ Best | 56.97 mas of [1] |
| Liftoff mass | — | 1,016 tas of [1] ↑ Best | 869 tas of [1] |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded | 94.1%as of [2]16/17 successes (10 CZ-5 + 7 CZ-5B). Failure: CZ-5 Y2 (Jul 2017, engine anomaly); loss of Shijian-18 satellite. ↑ Best |
| Total flights | 1as of [1] | 3as of [2] | 17as of [2] ↑ Best |
| Cost / kg LEO | — | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest | — |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. On May 28, 2026 a vehicle was destroyed in a prelaunch static-fire explosion at LC-36. Damage proved less severe than first feared — Blue Origin (CEO Dave Limp) reported the propellant tanks and water tower were undamaged, the launch tower repairable rather than replaced, and stored first/second stages intact, with LC-36 debris cleared within ~9 days. The company has started reconstruction and now targets a return to flight before the end of 2026 (a timeline some observers call aggressive). | China's most powerful operational rocket and the backbone of its flagship space programs. Launched Tianwen-1 to Mars, Chang'e 5 sample return, Chang'e 6 far-side sample return, all Tiangong core and lab modules, and the Xuntian space telescope. The CZ-5B variant delivers entire station modules in a single flight. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.