Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Gilmour Space Technologies | NASA / Boeing | Orienspace |
| Country | 🇦🇺 Australia | 🇺🇸 USA | 🇨🇳 China |
| Status | In Development | Active | Active |
| Vehicle class | Small | Super Heavy | Medium |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | LH₂ / LOX (RS-25); solid HTPB (SRBs) | Solid (HTPB) — three core stages + four strap-on boosters |
| Reusable | No | No | No |
| Stages | 3 | 2 | 3 |
| First flight | 2025 | 2022 | 2024 |
| Payload to LEO | 300 kgas of [1] | 95,000 kgas of [1] ↑ Best | 6,500 kgas of [1]~4,200 kg to 500 km SSO |
| Payload to GTO | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — |
| Height | 25 mas of [1] | 98.1 mas of [1] ↑ Best | 30 mas of [1] |
| Liftoff mass | — | 2,608 tas of [1] ↑ Best | ~400 tas of [1] |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 100%as of [2]2/2 successes: maiden flight Jan 11, 2024; second flight Oct 2025 delivered 3 commercial satellites to SSO ↑ Best |
| Total flights | 1as of [1] | 2as of [2] ↑ Best | 2as of [2]Both flights launched from a barge in the Yellow Sea off Haiyang, Shandong ↑ Best |
| Cost / kg LEO | — | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost ↓ Cheapest | — |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | The world's most powerful solid-propellant launch vehicle and the largest rocket yet flown from a sea platform. Orienspace's barge-launched Gravity-1 gives Chinese commercial customers a mobile, weather-flexible ride for mid-inclination smallsat batches; both flights to date succeeded. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.