Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Gilmour Space Technologies | SpaceX | ISRO |
| Country | 🇦🇺 Australia | 🇺🇸 USA | 🇮🇳 India |
| Status | In Development | In Development | Active |
| Vehicle class | Small | Super Heavy | Medium |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | CH₄ / LOX | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages |
| Reusable | No | Yes | No |
| Stages | 3 | 2 | 4 |
| First flight | 2025 | 2023 | 1993 |
| Payload to LEO | 300 kgas of [1] | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg |
| Payload to GTO | — | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best | — |
| Height | 25 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best | 44 mas of [1] |
| Liftoff mass | — | ~5,000 tas of [1] ↑ Best | 320 tas of [1]PSLV-XL configuration |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | ~50%as of [2]Flights 1-12; ~6 complete mission successes (incl. Flights 10 and 11), remainder partial or vehicle lost. First payload deploy on Flight 10 (Aug 2025); Flight 12 (V3 debut) lost during descent. | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). ↑ Best |
| Total flights | 1as of [1] | 12as of [2]Flight 1 (Apr 2023) through Flight 12 (May 22, 2026 — V3 debut from Pad 2). Flight 11 (Oct 13, 2025) closed out Block 2. | 64as of [2] ↑ Best |
| Cost / kg LEO | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest | ~$4,000/kgas of [1]Estimated from commercial launch contracts |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship debuted on Flight 12 (May 22, 2026) from Starbase Pad 2 — it reached space but broke up at the ocean surface, and the vehicle is grounded pending an FAA mishap review. Mechazilla booster catches demonstrated from Flight 5 (Oct 2024) onward; first payload deploy on Flight 10 (Aug 2025). Primary vehicle for the Artemis HLS lunar lander (Artemis III LEO docking demo 2027, first landing on Artemis IV). | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. The vehicle is on a return-to-flight campaign (not retired): PSLV-C63 (TDS-01 technology demonstrator), with strengthened third-stage/PS3 checks following the expert-committee (FAC) review, is targeted for late June / early July 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.