Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Gilmour Space Technologies | Avio / Arianespace | Firefly Aerospace |
| Country | 🇦🇺 Australia | 🇪🇺 Europe | 🇺🇸 USA |
| Status | In Development | Active | Active |
| Vehicle class | Small | Small | Small |
| Propellant | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) | Solid (HTPB + ammonium perchlorate all four stages) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 3 | 4 | 2 |
| First flight | 2025 | 2022 | 2021 |
| Payload to LEO | 300 kgas of [1] | 2,300 kgas of [1]SSO: ~1,700 kg ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | — | — | — |
| Height | 25 mas of [1] | 35 mas of [1] ↑ Best | 29 mas of [1] |
| Liftoff mass | — | 210 tas of [1] ↑ Best | 54 tas of [1] |
| Success rate | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. | 75%as of [2]6/8 successes; VV22 (Dec 2022) Zefiro-40 failure destroyed Pléiades Neo 5&6; returned to flight VV25 (Dec 2024). 3 successes in 2025. ↑ Best | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 1as of [1] | 8as of [2] ↑ Best | 7as of [2] |
| Cost / kg LEO | — | ~$16,500/kgas of [1]Based on ~$38M list price / 2,300 kg | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest |
| Summary | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. | Europe's primary small satellite launcher derived from Vega. The P120C first-stage motor is shared with Ariane 6's solid strap-on boosters. Avio took over programme management from Arianespace in Dec 2025. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.