Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | SpaceX | JAXA / IHI Aerospace | ISRO |
| Country | 🇺🇸 USA | 🇯🇵 Japan | 🇮🇳 India |
| Status | Active | Retired | Active |
| Vehicle class | Medium | Small | Heavy |
| Propellant | RP-1 / LOX | Solid (HTPB — all stages) | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) |
| Reusable | Yes | No | No |
| Stages | 2 | 3 | 3 |
| First flight | 2010 | 2013 – 2022 | 2017 |
| Payload to LEO | 22,800 kgas of [1]Reusable first stage (expended gives 22,800 kg; reused gives ~15,600 kg) ↑ Best | 590 kgas of [1]500 kg to SSO. Enhanced Epsilon (from E-4) added 700 kg LEO via PBS liquid kick stage. | 10,000 kgas of [1] |
| Payload to GTO | 8,300 kgas of [1]Expendable configuration. Reusable GTO capacity ~5,500 kg. ↑ Best | — | 4,000 kgas of [1] |
| Height | 70 mas of [1] ↑ Best | 26 mas of [1] | 43.43 mas of [1] |
| Liftoff mass | 549 tas of [1] | 96 tas of [1] | 643 tas of [1] ↑ Best |
| Success rate | 99.5%as of [2]634/637 full successes; Block 5 alone 580/581 = 99.8% | 83.3%as of [2]5/6 successes. E-6 (Oct 12, 2022) PBS upper stage failed to ignite, eight satellites lost. Epsilon S (next-generation) ground test anomaly Jan 2023 effectively ended the programme. | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best |
| Total flights | 637as of [2] ↑ Best | 6as of [2] | 10as of [2] |
| Cost / kg LEO | ~$2,720/kgas of [1]Based on $67M list price / 22,800 kg LEO (expendable) ↓ Cheapest | — | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) |
| Summary | The world's most frequently flown orbital rocket. Block 5 first stages have landed over 280 times and reflown up to 23 times. Backbone of Starlink and commercial crewed launches. | JAXA's small solid-fuel rocket derived from the M-V rocket heritage. Designed for highly autonomous operations — launch preparations could be managed by just 8 people. The sixth and final E-6 mission (Oct 2022) failed when the PBS kick stage didn't ignite; a ground explosion during Epsilon S testing (Jan 2023) ended the programme. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.