Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | SpaceX | PLD Space | Gilmour Space Technologies |
| Country | 🇺🇸 USA | 🇪🇸 Spain | 🇦🇺 Australia |
| Status | Active | In Development | In Development |
| Vehicle class | Heavy | Small | Small |
| Propellant | RP-1 / LOX | RP-1 / LOX | Hybrid (Sirius motors, stages 1–2) / liquid (Phoenix engine, stage 3) |
| Reusable | Yes | Yes | No |
| Stages | 2 | 2 | 3 |
| First flight | 2018 | 2026 | 2025 |
| Payload to LEO | 63,800 kgas of [1]Expended side boosters. Fully reusable ~27,500 kg LEO. ↑ Best | 1,080 kgas of [1]540 kg to SSO. First flight is a stated plan (targeted Q1 2026 as of this research; not yet confirmed flown) — treat as a target, not a fact. | 300 kgas of [1] |
| Payload to GTO | 26,700 kgas of [1]Expendable configuration; reusable ~8,000 kg ↑ Best | — | — |
| Height | 70 mas of [1] ↑ Best | 35.7 mas of [1] | 25 mas of [1] |
| Liftoff mass | 1,421 tas of [1] ↑ Best | 69 tas of [1] | — |
| Success rate | 100%as of [2]12/12 mission successes through Falcon Heavy ViaSat-3 F3 (Apr 29, 2026) ↑ Best | — | 0/1as of [1]Maiden flight 2025-07-30 crashed 14 seconds after launch (insufficient thrust), from Bowen Orbital Spaceport, Queensland — Australia's first domestic orbital launch attempt. Preceded by two scrubs (2025-05-15 electrical issue, 2025-05-16 fairing anomaly). A second test flight was slated for early 2026. Block 2 (1,000 kg payload) and Eris Heavy (4,000 kg payload) variants are planned. |
| Total flights | 12as of [2] ↑ Best | — | 1as of [1] |
| Cost / kg LEO | ~$1,400/kgas of [1]Based on ~$97M list price / 63,800 kg (expendable configuration) ↓ Cheapest | — | — |
| Summary | Currently the most powerful operational rocket in the world. Three Falcon 9 cores sharing propellant cross-feed produce 5.1 MN of sea-level thrust. Primary mission profile: DoD/NRO GEO payloads and planetary science. | PLD Space's orbital small launcher with a recoverable first stage (engine thrust + parachutes), developed with ESA Future Launchers Preparatory Programme support; primary launch site is the Guiana Space Centre. | Australia's first domestically developed orbital launch vehicle attempt, using a hybrid-propellant first and second stage; the maiden flight failed 14 seconds after liftoff in July 2025. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.