Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Firefly Aerospace | ISRO | Firefly Aerospace / Northrop Grumman |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Small | Heavy | Medium |
| Propellant | RP-1 / LOX | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 3 | 2 |
| First flight | 2021 | 2017 | 2027 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 10,000 kgas of [1] | 16,000+ kgas of [1]5 m fairing. Renamed from 'Medium Launch Vehicle' (MLV) to 'Eclipse' in May 2025 alongside the Northrop Grumman partnership. First stage (7 Miranda engines) designed for reuse from roughly the 6th flight onward; second stage uses one Vira engine. First flight targeted 2027 — stated plan, not yet flown. ↑ Best |
| Payload to GTO | — | 4,000 kgas of [1] ↑ Best | — |
| Height | 29 mas of [1] | 43.43 mas of [1] ↑ Best | — |
| Liftoff mass | 54 tas of [1] | 643 tas of [1] ↑ Best | — |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | — |
| Total flights | 7as of [2] | 10as of [2] ↑ Best | — |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | A medium-lift successor to Firefly's Alpha, co-developed with Northrop Grumman, aimed at the national-security and commercial medium-lift gap between small launchers and heavy-lift vehicles. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.