Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Firefly Aerospace | JAXA / Mitsubishi Heavy Industries | Northrop Grumman |
| Country | 🇺🇸 USA | 🇯🇵 Japan | 🇺🇸 USA |
| Status | Active | Active | Retired |
| Vehicle class | Small | Heavy | Medium |
| Propellant | RP-1 / LOX | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) | RP-1 / LOX (RD-181 first stage) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 2 |
| First flight | 2021 | 2024 | 2013 – 2023 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. ↑ Best | 8,000 kgas of [1]Antares 230+ configuration; primarily used for ~3,500–3,800 kg Cygnus cargo |
| Payload to GTO | — | 6,500 kgas of [1] ↑ Best | — |
| Height | 29 mas of [1] | 57 mas of [1] ↑ Best | 41 mas of [1] |
| Liftoff mass | 54 tas of [1] | 574 tas of [1]H3-24S configuration ↑ Best | 298 tas of [1] |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 75%as of [2]~6/8 successes. TF1 (Feb 2023) first flight failure (LE-9 ignition issue, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. | 91.7%as of [2]11/12 successes; Orb-3 (CRS-3) exploded at liftoff Oct 2014 ↑ Best |
| Total flights | 7as of [2] | 8as of [2] | 12as of [2]Final Antares flight was NG-19 (Aug 1, 2023). NG-20+ moved to Falcon 9 due to Antares RD-181 engine supply disruption (Russia sanctions). ↑ Best |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost ↓ Cheapest | — |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses three LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First successful flight was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness. | Primary launch vehicle for Cygnus ISS cargo missions from 2013–2023. Its Ukrainian-built Zenit-derived first stage and Russian RD-181 engines became untenable after the 2022 invasion of Ukraine. Northrop switched NG-20 onward to Falcon 9 while Antares 330 (with Firefly Miranda engines) is in development. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.