Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Firefly Aerospace | Rocket Lab | SpaceX |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇺🇸 USA |
| Status | Active | In Development | In Development |
| Vehicle class | Small | Medium | Super Heavy |
| Propellant | RP-1 / LOX | CH₄ / LOX | CH₄ / LOX |
| Reusable | No | Yes | Yes |
| Stages | 2 | 2 | 2 |
| First flight | 2021 | 2026 | 2023 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 13,000 kgas of [1]Expendable; ~8,000 kg reusable with first-stage return | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | — | — | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best |
| Height | 29 mas of [1] | ~40 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best |
| Liftoff mass | 54 tas of [1] | ~481 tas of [1] | ~5,000 tas of [1] ↑ Best |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | — | ~55%as of [2]IFT-1 through IFT-11; ~6 complete mission successes, remainder partial or vehicle lost. No orbital payload deployment yet. ↑ Best |
| Total flights | 7as of [2] | — | 11as of [2]IFT-1 (Apr 2023) through IFT-11 (May 2026 target). IFT-10 (Aug 2025) achieved full mission: booster caught + Ship splash-down. ↑ Best |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | — | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Rocket Lab's medium-lift reusable rocket targeting the $100B constellation replenishment market. Uses a 'hungry hippo' fairings design that opens at the top rather than traditional clamshell separation. First flight delayed to Q4 2026 after a Jan 2026 propellant tank test anomaly. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship introduced Aug 2025. Mechazilla caught the booster on IFT-5 (Oct 2024) and IFT-10 (Aug 2025). Primary vehicle for Artemis HLS lunar landing (Artemis III planned 2026). |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.