Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | Firefly Aerospace | Blue Origin | CASC / CALT |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇨🇳 China |
| Status | Active | Active | Active |
| Vehicle class | Small | Heavy | Heavy |
| Propellant | RP-1 / LOX | LNG / LOX (BE-4); LH₂ / LOX (BE-3U second stage) | UDMH/N₂O₄ (stages 1–2) + LH₂/LOX (stage 3 YF-75) |
| Reusable | No | Yes | No |
| Stages | 2 | 2 | 3 |
| First flight | 2021 | 2025 | 1996 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 45,000 kgas of [1]Reusable first stage; expendable ~45,000 kg. GTO (reusable) ~13,000 kg. ↑ Best | 11,200 kgas of [1] |
| Payload to GTO | — | 13,000 kgas of [1]Reusable first stage configuration ↑ Best | 5,500 kgas of [1]With 4 strap-on liquid boosters (CZ-3B/E enhanced variant) |
| Height | 29 mas of [1] | 98 mas of [1] ↑ Best | 54.84 mas of [1] |
| Liftoff mass | 54 tas of [1] | 1,016 tas of [1] ↑ Best | 426 tas of [1]Enhanced variant with 4 liquid strap-on boosters |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 67%as of [2]NG-1 (Jan 2025) full mission success, booster lost; NG-2 (Nov 2025) success + first Jacklyn booster landing; NG-3 (Apr 2026) partial — payload in wrong orbit, FAA grounded | ~95%as of [2]~6 failures/partial failures out of ~105+ flights; gradually being superseded by Long March 5 for GTO ↑ Best |
| Total flights | 7as of [2] | 3as of [2] | ~105as of [2] ↑ Best |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ~$1,500/kgas of [1]Estimated from ~$67M commercial pricing / 45,000 kg payload capacity ↓ Cheapest | — |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | Blue Origin's first orbital rocket. The 7-meter payload fairing is the widest of any current production rocket. NG-2 (Nov 2025) achieved the company's first booster landing on drone ship Jacklyn. | China's primary geostationary transfer vehicle for over 25 years. Launched communications, meteorology, and navigation satellites including Beidou-3 (GEO/IGSO nodes). Being phased out in favour of Long March 5 for heavier GTO payloads as newer domestic communications satellites grow in mass. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.