Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | Nuri (KSLV-II) 🇰🇷 South Korea Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | Firefly Aerospace | NASA / Boeing | KARI / Hanwha Aerospace |
| Country | 🇺🇸 USA | 🇺🇸 USA | 🇰🇷 South Korea |
| Status | Active | Active | Active |
| Vehicle class | Small | Super Heavy | Medium |
| Propellant | RP-1 / LOX | LH₂ / LOX (RS-25); solid HTPB (SRBs) | RP-1 / LOX (KRE-075 engines all stages) |
| Reusable | No | No | No |
| Stages | 2 | 2 | 3 |
| First flight | 2021 | 2022 | 2021 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 95,000 kgas of [1] ↑ Best | 2,600 kgas of [1]600 km SSO target orbit |
| Payload to GTO | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best | — |
| Height | 29 mas of [1] | 98.1 mas of [1] ↑ Best | 47.2 mas of [1] |
| Liftoff mass | 54 tas of [1] | 2,608 tas of [1] ↑ Best | 200 tas of [1] |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) ↑ Best | 75%as of [2]3/4 full successes: TF1 (Oct 2021) partial, TF2 (Jun 2022) success, TF3 (May 2023) success, TF4 (Nov 27, 2025 — first Hanwha-led production launch) success |
| Total flights | 7as of [2] ↑ Best | 2as of [2] | 4as of [2] |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost | — |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. | South Korea's first domestically developed and produced launch vehicle, designed entirely without foreign engine technology. Nuri TF4 (Nov 2025) was the first launch managed by Hanwha Aerospace rather than KARI — marking the transition to commercial operation. KASA (Korea Aerospace Administration) took over programme oversight in 2024. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.