Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Firefly Aerospace | ISRO / Hindustan Aeronautics Limited | JAXA / Mitsubishi Heavy Industries |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇯🇵 Japan |
| Status | Active | Active | Active |
| Vehicle class | Small | Small | Heavy |
| Propellant | RP-1 / LOX | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) |
| Reusable | No | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2021 | 2022 | 2023 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. ↑ Best |
| Payload to GTO | — | — | 6,500 kgas of [1] ↑ Best |
| Height | 29 mas of [1] | 34 mas of [1] | 57 mas of [1] ↑ Best |
| Liftoff mass | 54 tas of [1] | 120 tas of [1] | 574 tas of [1]H3-24S configuration ↑ Best |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best | 78%as of [2]~7/9 successes. TF1 (Mar 7, 2023) first flight failure (2nd-stage ignition, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. H3-30 maiden flight (Jun 12, 2026) successful. |
| Total flights | 7as of [2] | 3as of [1] | 9as of [3]Includes the H3-30 (three LE-9 engines, no SRBs) maiden flight on Jun 12, 2026 ↑ Best |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost ↓ Cheapest |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First flight TF1 (Mar 7, 2023) failed; first success was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness, and the solid-booster-free H3-30 variant debuted Jun 12, 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.