Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | SSLV (Small Satellite Launch Vehicle) 🇮🇳 India Trust: Operator-primaryⓘ Last verified Active · Last updated 2026-07-26Remove × | ||
|---|---|---|---|
| Company | Firefly Aerospace | ISRO / Hindustan Aeronautics Limited | NASA / Boeing |
| Country | 🇺🇸 USA | 🇮🇳 India | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Small | Small | Super Heavy |
| Propellant | RP-1 / LOX | Solid (HTPB, stages 1–3) / MMH-MON3 liquid (velocity trimming module) | LH₂ / LOX (RS-25); solid HTPB (SRBs) |
| Reusable | No | No | No |
| Stages | 2 | 4 | 2 |
| First flight | 2021 | 2022 | 2022 |
| Payload to LEO | 1,030 kgas of [1]SSO capacity ~630 kg | 500 kgas of [1]500 km altitude, 35–55° inclination. 300 kg to 500 km SSO. | 95,000 kgas of [1] ↑ Best |
| Payload to GTO | — | — | 27,000 kgas of [1]Trans-lunar injection (TLI) payload; GTO not a primary design goal ↑ Best |
| Height | 29 mas of [1] | 34 mas of [1] | 98.1 mas of [1] ↑ Best |
| Liftoff mass | 54 tas of [1] | 120 tas of [1] | 2,608 tas of [1] ↑ Best |
| Success rate | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 | 2/3 (67%)as of [1]First flight (Aug 2022) partial failure — satellites reached a lower-than-planned orbit. Second and third flights successful. ↑ Best | 100%as of [2]2/2: Artemis I uncrewed (Nov 16, 2022) + Artemis II crewed lunar flyby (Apr 1–10, 2026) |
| Total flights | 7as of [2] ↑ Best | 3as of [1] | 2as of [2] |
| Cost / kg LEO | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO ↓ Cheapest | ₹30–35 crore per launch (~$3.1M–$3.6M)as of [1]Total launch price, not a per-kg figure. | ~$40,000+/kgas of [3]NASA OIG (2023) estimated $4.1B per Artemis SLS/Orion flight; total program $23B+ development cost |
| Summary | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. | ISRO's small-satellite launcher, designed for quick-turnaround dedicated smallsat missions. Full manufacturing, marketing and launch rights were transferred to Hindustan Aeronautics Limited in June 2025 under a technology-transfer agreement. | NASA's human deep space launch vehicle for the Artemis programme. Uses heritage RS-25 shuttle main engines (4 per flight, expended). Block 1B with Exploration Upper Stage cancelled Feb 2026; Block 1 will fly through Artemis IV at minimum. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.