Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | Khrunichev / Roscosmos | Roscosmos / Progress Rocket Space Centre |
| Country | 🇮🇳 India | 🇷🇺 Russia | 🇷🇺 Russia |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Heavy | Medium |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | RP-1 / LOX (RD-191, all 5 modules) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 3 | 2 | 3 |
| First flight | 2017 | 2014 | 2004 |
| Payload to LEO | 10,000 kgas of [1] | 24,500 kgas of [1]With KVTK cryogenic upper stage (planned); Briz-M gives ~5,400 kg GTO ↑ Best | 8,200 kgas of [1]Soyuz-2.1b with Fregat upper stage; 2.1a variant ~7,020 kg LEO |
| Payload to GTO | 4,000 kgas of [1] | 5,400 kgas of [1]Briz-M upper stage. KVTK would raise this to ~7,500 kg. ↑ Best | 3,250 kgas of [1]With Fregat-M upper stage |
| Height | 43.43 mas of [1] | 64 mas of [1] ↑ Best | 46.3 mas of [1] |
| Liftoff mass | 643 tas of [1] | 773 tas of [1] ↑ Best | 312 tas of [1] |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 100%as of [2]4/4 mission successes: Dec 2014, Dec 2020, Mar 2023, Apr 2024 ↑ Best | 97%as of [2]~160/165 mission successes since 2004 per aggregated launch logs |
| Total flights | 10as of [2] | 4as of [2] | ~165as of [2] ↑ Best |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — | — |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Russia's new-generation heavy-lift rocket built entirely of Russian-manufactured components — a political priority after Proton-M's dependence on Ukrainian components. Five URM-1 universal rocket modules share the same propellant (RP-1/LOX), unlike Proton-M's toxic hypergolics. Flight rate remains very low. | Russia's primary medium-lift workhorse, descended from the Soyuz family that has flown since 1966. Carries both crewed Soyuz spacecraft and Cygnus-class cargo. Fregat upper stage significantly expands mission flexibility. Production continues at Samara (now TsSKB-Progress). |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.