Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | Orienspace | Isar Aerospace |
| Country | 🇮🇳 India | 🇨🇳 China | 🇩🇪 Germany |
| Status | Active | Active | In Development |
| Vehicle class | Heavy | Medium | Small |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | Solid (HTPB) — three core stages + four strap-on boosters | LOX / kerosene (~80% manufactured in-house) |
| Reusable | No | No | No |
| Stages | 3 | 3 | 2 |
| First flight | 2017 | 2024 | 2025 |
| Payload to LEO | 10,000 kgas of [1] ↑ Best | 6,500 kgas of [1]~4,200 kg to 500 km SSO | 1,000 kgas of [1] |
| Payload to GTO | 4,000 kgas of [1] ↑ Best | — | — |
| Height | 43.43 mas of [1] ↑ Best | 30 mas of [1] | — |
| Liftoff mass | 643 tas of [1] ↑ Best | ~400 tas of [1] | — |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 100%as of [2]2/2 successes: maiden flight Jan 11, 2024; second flight Oct 2025 delivered 3 commercial satellites to SSO ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. |
| Total flights | 10as of [2] ↑ Best | 2as of [2]Both flights launched from a barge in the Yellow Sea off Haiyang, Shandong | 1as of [1] |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — | — |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | The world's most powerful solid-propellant launch vehicle and the largest rocket yet flown from a sea platform. Orienspace's barge-launched Gravity-1 gives Chinese commercial customers a mobile, weather-flexible ride for mid-inclination smallsat batches; both flights to date succeeded. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.