Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | JAXA / Mitsubishi Heavy Industries | Firefly Aerospace |
| Country | 🇮🇳 India | 🇯🇵 Japan | 🇺🇸 USA |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Heavy | Small |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) | RP-1 / LOX |
| Reusable | No | No | No |
| Stages | 3 | 2 | 2 |
| First flight | 2017 | 2024 | 2021 |
| Payload to LEO | 10,000 kgas of [1] | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. ↑ Best | 1,030 kgas of [1]SSO capacity ~630 kg |
| Payload to GTO | 4,000 kgas of [1] | 6,500 kgas of [1] ↑ Best | — |
| Height | 43.43 mas of [1] | 57 mas of [1] ↑ Best | 29 mas of [1] |
| Liftoff mass | 643 tas of [1] ↑ Best | 574 tas of [1]H3-24S configuration | 54 tas of [1] |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 75%as of [2]~6/8 successes. TF1 (Feb 2023) first flight failure (LE-9 ignition issue, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. | 43%as of [2]3/7 full successes (FLTA003 Jul 2023, FLTA005 Dec 2024, FLTA007 Mar 2026) + 2 partial successes + 2 failures through FLTA007 |
| Total flights | 10as of [2] ↑ Best | 8as of [2] | 7as of [2] |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost | ~$14,500/kgas of [1]Based on ~$15M list price / 1,030 kg LEO |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses three LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First successful flight was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness. | Firefly Aerospace's two-stage small-lift rocket powered by four Reaver engines at sea level and one Lightning engine in vacuum. Also provides launch services for NASA's CLPS programme (Blue Ghost lander launched on Falcon 9). FLTA007 'Stairway to Seven' succeeded Mar 11, 2026. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.