Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | CASC / CALT | JAXA / Mitsubishi Heavy Industries |
| Country | 🇮🇳 India | 🇨🇳 China | 🇯🇵 Japan |
| Status | Active | Active | Retired |
| Vehicle class | Heavy | Heavy | Medium |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LH₂ / LOX (YF-77 core) + RP-1/LOX (YF-100 boosters) | LH₂ / LOX (LE-7A first stage + LE-5B second stage) |
| Reusable | No | No | No |
| Stages | 3 | 2 | 2 |
| First flight | 2017 | 2016 | 2001 – 2025 |
| Payload to LEO | 10,000 kgas of [1] | 25,000 kgas of [1]CZ-5B variant (no upper stage) delivers 25,000 kg LEO for Tiangong station modules ↑ Best | 10,000 kgas of [1]202 configuration (2 SRB-A3 solid strap-ons) |
| Payload to GTO | 4,000 kgas of [1] | 14,000 kgas of [1]CZ-5 variant (with YF-75D upper stage) ↑ Best | 4,100 kgas of [1]202 configuration |
| Height | 43.43 mas of [1] | 56.97 mas of [1] ↑ Best | 53 mas of [1] |
| Liftoff mass | 643 tas of [1] | 869 tas of [1] ↑ Best | 285 tas of [1]202 configuration |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 94.1%as of [2]16/17 successes (10 CZ-5 + 7 CZ-5B). Failure: CZ-5 Y2 (Jul 2017, engine anomaly); loss of Shijian-18 satellite. | 98%as of [2]49/50 successes. Only failure: F6 (Nov 2003, MTSAT-1R lost due to SRB separation anomaly). Retired after Flight 50 (GOSAT-GW, Jun 28, 2025). |
| Total flights | 10as of [2] | 17as of [2] | 50as of [2]50 flights from 2001–2025. H3 replaces it from 2024 onward. ↑ Best |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — | — |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | China's most powerful operational rocket and the backbone of its flagship space programs. Launched Tianwen-1 to Mars, Chang'e 5 sample return, Chang'e 6 far-side sample return, all Tiangong core and lab modules, and the Xuntian space telescope. The CZ-5B variant delivers entire station modules in a single flight. | Japan's flagship medium-lift rocket for 24 years, retiring after an exceptional 49/50 mission success record. Launched the SELENE lunar orbiter (2007), Akatsuki Venus probe (2010), Hayabusa2 (2014), SLIM lunar lander (2023), and the ALOS series Earth observation satellites. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.