Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | Isar Aerospace | PLD Space |
| Country | 🇮🇳 India | 🇩🇪 Germany | 🇪🇸 Spain |
| Status | Active | In Development | In Development |
| Vehicle class | Heavy | Small | Small |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LOX / kerosene (~80% manufactured in-house) | RP-1 / LOX |
| Reusable | No | No | Yes |
| Stages | 3 | 2 | 2 |
| First flight | 2017 | 2025 | 2026 |
| Payload to LEO | 10,000 kgas of [1] ↑ Best | 1,000 kgas of [1] | 1,080 kgas of [1]540 kg to SSO. First flight is a stated plan (targeted Q1 2026 as of this research; not yet confirmed flown) — treat as a target, not a fact. |
| Payload to GTO | 4,000 kgas of [1] ↑ Best | — | — |
| Height | 43.43 mas of [1] ↑ Best | — | 35.7 mas of [1] |
| Liftoff mass | 643 tas of [1] ↑ Best | — | 69 tas of [1] |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. | — |
| Total flights | 10as of [2] ↑ Best | 1as of [1] | — |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | — | — |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. | PLD Space's orbital small launcher with a recoverable first stage (engine thrust + parachutes), developed with ESA Future Launchers Preparatory Programme support; primary launch site is the Guiana Space Centre. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.