Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | ULA | Isar Aerospace |
| Country | 🇮🇳 India | 🇺🇸 USA | 🇩🇪 Germany |
| Status | Active | Active | In Development |
| Vehicle class | Heavy | Heavy | Small |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | LNG / LOX (BE-4); LH₂ / LOX (Centaur V) | LOX / kerosene (~80% manufactured in-house) |
| Reusable | No | No | No |
| Stages | 3 | 2 | 2 |
| First flight | 2017 | 2024 | 2025 |
| Payload to LEO | 10,000 kgas of [1] | 27,200 kgas of [1]VC2S configuration (2 solid strap-on boosters) ↑ Best | 1,000 kgas of [1] |
| Payload to GTO | 4,000 kgas of [1] | 14,400 kgas of [1] ↑ Best | — |
| Height | 43.43 mas of [1] | 61.6 mas of [1] ↑ Best | — |
| Liftoff mass | 643 tas of [1] ↑ Best | 591 tas of [1]VC2S configuration | — |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 100%as of [2]4/4 payloads delivered: Cert-1 (Jan 2024), Cert-2 (Oct 2024, SRB nozzle anomaly), USSF-106 (Aug 13, 2025 — flight 3, first NSSL mission), USSF-87 (Feb 12, 2026 — flight 4, second SRB nozzle anomaly; Space Force paused Vulcan launches, RTF ~late 2026) ↑ Best | 0/1 (first flight failed)as of [1]First flight from Andøya Spaceport (2025-03-30): liftoff succeeded but the rocket was terminated ~30 seconds in after a vent valve opened unexpectedly, causing loss of attitude control. Second flight ('Onward and Upward') repeatedly delayed through 2026 (weather, a safety-zone fishing vessel, a composite pressure vessel leak, then off-nominal fluid-system behavior as of 2026-06-15) — not yet flown as of this research. |
| Total flights | 10as of [2] ↑ Best | 4as of [2] | 1as of [1] |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) ↓ Cheapest | ~$5,500/kgas of [1]Estimated; list pricing not public. Priced below Atlas V, above Ariane 6. | — |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | ULA's next-generation medium-heavy rocket replacing Atlas V. Powered by two BE-4 engines on the first stage and a cryogenic Centaur V upper stage. NSSL-certified March 2025; first NSSL mission USSF-106 flew Aug 13, 2025. Paused by the Space Force after the USSF-87 SRB nozzle anomaly (Feb 12, 2026), with return to flight expected ~late 2026. | Germany's first orbital-class launcher attempt; its first flight in March 2025 was Western Europe's first orbital launch attempt from the European mainland. A qualification second flight carrying CubeSats and ESA experiments has slipped repeatedly through 2026. |
48 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.