Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | GSLV Mk III (LVM3) 🇮🇳 India Trust: Agency-primaryⓘ Last verified Active · Last updated 2026-06-01Remove × | ||
|---|---|---|---|
| Company | ISRO | LandSpace | ISRO |
| Country | 🇮🇳 India | 🇨🇳 China | 🇮🇳 India |
| Status | Active | Active | Active |
| Vehicle class | Heavy | Medium | Medium |
| Propellant | Solid (S200 boosters) + UDMH/N₂O₄ (L110) + LH₂/LOX (C25) | CH₄ / LOX (Tianque-12 + Tianque-15 upper stage) | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages |
| Reusable | No | No | No |
| Stages | 3 | 2 | 4 |
| First flight | 2017 | 2022 | 1993 |
| Payload to LEO | 10,000 kgas of [1] ↑ Best | 6,000 kgas of [1]SSO capacity ~4,000 kg | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg |
| Payload to GTO | 4,000 kgas of [1] ↑ Best | — | — |
| Height | 43.43 mas of [1] | 49.5 mas of [1] ↑ Best | 44 mas of [1] |
| Liftoff mass | 643 tas of [1] ↑ Best | 219 tas of [1] | 320 tas of [1]PSLV-XL configuration |
| Success rate | 100%as of [2]10/10 missions since development flight 2014 (D1). Production flights since 2017. ↑ Best | 75%as of [2]3/4 full successes; ZQ-2 Y1 (Dec 2022) reached orbit on stage 1 but 2nd stage failed; ZQ-2 Y2 (Jul 2023) SUCCESS — world's first methane-fueled rocket to reach orbit | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). |
| Total flights | 10as of [2] | 4as of [2] | 64as of [2] ↑ Best |
| Cost / kg LEO | ~$4,500/kgas of [1]Estimated from OneWeb commercial contract ~$450M for 36 satellites (~5 tonne batch to GTO) | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest |
| Summary | India's most powerful rocket. Launched Chandrayaan-3 (Moon lander) in Jul 2023 and OneWeb internet satellites commercially. Renamed LVM3 (Launch Vehicle Mark 3) in 2022. The CE-20 cryogenic engine was entirely ISRO-developed — previously India depended on Russian technology for the GSLV Mk II. | The world's first methane-fueled rocket to achieve orbit (July 12, 2023), beating SpaceX Starship to that milestone. A commercial Chinese rocket built by LandSpace with vertically-integrated methane propulsion — the same propellant strategy as Starship, Neutron, and Terran R. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.