Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | JAXA / Mitsubishi Heavy Industries | ISRO | CASC / CALT |
| Country | 🇯🇵 Japan | 🇮🇳 India | 🇨🇳 China |
| Status | Retired | Active | Active |
| Vehicle class | Medium | Medium | Heavy |
| Propellant | LH₂ / LOX (LE-7A first stage + LE-5B second stage) | Solid (PS1/PS3) + UDMH/N₂O₄ (PS2/PS4) — 4 alternating stages | UDMH/N₂O₄ (stages 1–2) + LH₂/LOX (stage 3 YF-75) |
| Reusable | No | No | No |
| Stages | 2 | 4 | 3 |
| First flight | 2001 – 2025 | 1993 | 1996 |
| Payload to LEO | 10,000 kgas of [1]202 configuration (2 SRB-A3 solid strap-ons) | 3,800 kgas of [1]PSLV-XL with 6 extended solid strap-ons. Standard PSLV-G: 3,250 kg LEO. SSO: ~1,750 kg | 11,200 kgas of [1] ↑ Best |
| Payload to GTO | 4,100 kgas of [1]202 configuration | — | 5,500 kgas of [1]With 4 strap-on liquid boosters (CZ-3B/E enhanced variant) ↑ Best |
| Height | 53 mas of [1] | 44 mas of [1] | 54.84 mas of [1] ↑ Best |
| Liftoff mass | 285 tas of [1]202 configuration | 320 tas of [1]PSLV-XL configuration | 426 tas of [1]Enhanced variant with 4 liquid strap-on boosters ↑ Best |
| Success rate | 98%as of [2]49/50 successes. Only failure: F6 (Nov 2003, MTSAT-1R lost due to SRB separation anomaly). Retired after Flight 50 (GOSAT-GW, Jun 28, 2025). ↑ Best | 93.7%as of [2]60/64 mission successes. Two consecutive recent failures: C61 (2024) and C62 (Jan 12, 2026, stage-3 anomaly, 16 satellites lost). | ~95%as of [2]~6 failures/partial failures out of ~105+ flights; gradually being superseded by Long March 5 for GTO |
| Total flights | 50as of [2]50 flights from 2001–2025. H3 replaces it from 2024 onward. | 64as of [2] | ~105as of [2] ↑ Best |
| Cost / kg LEO | — | ~$4,000/kgas of [1]Estimated from commercial launch contracts ↓ Cheapest | — |
| Summary | Japan's flagship medium-lift rocket for 24 years, retiring after an exceptional 49/50 mission success record. Launched the SELENE lunar orbiter (2007), Akatsuki Venus probe (2010), Hayabusa2 (2014), SLIM lunar lander (2023), and the ALOS series Earth observation satellites. | India's most reliable and frequently flown launch vehicle, operational since 1994. Set a world record in Feb 2017 by deploying 104 satellites in a single flight (Cartosat-2D + 103 microsats). Launched Chandrayaan-1 (2008), Mars Orbiter Mission (2013), and Aditya-L1 (2023). The dual C61/C62 failure streak raised concerns about aging solid motor design. | China's primary geostationary transfer vehicle for over 25 years. Launched communications, meteorology, and navigation satellites including Beidou-3 (GEO/IGSO nodes). Being phased out in favour of Long March 5 for heavier GTO payloads as newer domestic communications satellites grow in mass. |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.