Pick up to 4 launch vehicles to compare side-by-side. State lives in the URL — share the link and the comparison loads exactly as you left it.
The global launch market reached $14.1 billion in 2024 — up 34% since 2021.
| Attribute | |||
|---|---|---|---|
| Company | JAXA / Mitsubishi Heavy Industries | Avio / Arianespace | SpaceX |
| Country | 🇯🇵 Japan | 🇪🇺 Europe | 🇺🇸 USA |
| Status | Active | Active | In Development |
| Vehicle class | Heavy | Small | Super Heavy |
| Propellant | LH₂ / LOX (LE-9 first stage + LE-5B-3 second stage) | Solid (HTPB + ammonium perchlorate all four stages) | CH₄ / LOX |
| Reusable | No | No | Yes |
| Stages | 2 | 4 | 2 |
| First flight | 2024 | 2022 | 2023 |
| Payload to LEO | 16,500 kgas of [1]H3-24 (2 SRB-3 + 4 LE-9 engines) configuration. H3-30 baseline: 16,500 kg. | 2,300 kgas of [1]SSO: ~1,700 kg | ~150,000 kgas of [1]SpaceX projected max payload in fully expendable mode; ~100,000 kg reusable ↑ Best |
| Payload to GTO | 6,500 kgas of [1] | — | ~21,000 kgas of [1]Reusable configuration estimate ↑ Best |
| Height | 57 mas of [1] | 35 mas of [1] | 121 mas of [1]Version 2 (V2) full stack Ship + Super Heavy ↑ Best |
| Liftoff mass | 574 tas of [1]H3-24S configuration | 210 tas of [1] | ~5,000 tas of [1] ↑ Best |
| Success rate | 75%as of [2]~6/8 successes. TF1 (Feb 2023) first flight failure (LE-9 ignition issue, DAICHI-3 lost). F8 (Dec 23, 2025) QZS-5 lost to 2nd-stage relight anomaly. ↑ Best | 75%as of [2]6/8 successes; VV22 (Dec 2022) Zefiro-40 failure destroyed Pléiades Neo 5&6; returned to flight VV25 (Dec 2024). 3 successes in 2025. ↑ Best | ~55%as of [2]IFT-1 through IFT-11; ~6 complete mission successes, remainder partial or vehicle lost. No orbital payload deployment yet. |
| Total flights | 8as of [2] | 8as of [2] | 11as of [2]IFT-1 (Apr 2023) through IFT-11 (May 2026 target). IFT-10 (Aug 2025) achieved full mission: booster caught + Ship splash-down. ↑ Best |
| Cost / kg LEO | ~$5,500/kgas of [1]Target unit price ¥5B (~$35M at ¥145/$); roughly half H-IIA's per-launch cost | ~$16,500/kgas of [1]Based on ~$38M list price / 2,300 kg | ~$600/kgas of [1]SpaceX target figure; not yet achieved in operational configuration ↓ Cheapest |
| Summary | Japan's next-generation flagship rocket designed to halve H-IIA costs. Uses three LE-9 engines burning liquid hydrogen — the highest-performing expander-cycle engines in the world. First successful flight was TF2 (Feb 17, 2024). HTV-X1 cargo mission to ISS (Oct 2025) demonstrated operational readiness. | Europe's primary small satellite launcher derived from Vega. The P120C first-stage motor is shared with Ariane 6's solid strap-on boosters. Avio took over programme management from Arianespace in Dec 2025. | Largest and most powerful rocket ever flown. Super Heavy booster uses 33 Raptor engines. V3 Ship introduced Aug 2025. Mechazilla caught the booster on IFT-5 (Oct 2024) and IFT-10 (Aug 2025). Primary vehicle for Artemis HLS lunar landing (Artemis III planned 2026). |
28 launch vehicles across 10 countries — active, retired, and in development — with primary-source citations from manufacturer user guides and agency press kits. Pure URL state: bookmark or share the link and the comparison reproduces exactly.